Upcoming utility work is planned for Tech Square Phase 3.
Foundation work for the construction project requires blasting for rock removal.
Road detour required for phase 2 of the Loop B electrical expansion project.
Milling and paving work to occur 12/18 - 12/21.
Electrical expansion work will affect the east side of Curran Street between 8th and 9th street.
Utility work begins requiring one lane of traffic to be closed on Spring Street near Biltmore Place.
Fencing and erosion control will begin September 11 in preparation for site work.
Construction mobilizes on the planned tribute walkway outside the Veterans Resource Center.
A small section of concrete near the Van Leer building will be replaced during this project.
Repairs to the School of Architecture East Building envelope to occur August - December 2023.